Three traffic interchanges are integrated in this stretch of highway, connecting the new road with VR1 (through the Câmara de Lobos interchange) and with the municipal road (Covão highway), where the new connecting road to Jardim da Serra will leave from. It also includes the connection with the local road network at Estreito de Câmara de Lobos (through the Câmara de Lobos interchange). Along this stretch, 4 viaducts, 3 underpasses, 5 overpasses and 1 double tunnel with an average length of 352.5 m will be executed.