Stabilisation of embankments on the Régua-Ferrão section, Douro line (lot 3)

Work owner
IP - Infraestruturas de Portugal, E.P.
Location
Portugal
Year
2022

Stabilisation and consolidation of embankments of variable heights with a maximum of 27 metres, including clean-up, removal of loose rocks, upgrading of drainage systems, cover application of mortared stone and application of the associated nailing and meshes and cables of high-strength steel.