Execution of various works on the Ribeira Brava pier with a view to repositioning its functions. The works included: restoration and reinforcement of the protection breakwater; reconstruction of the curtain wall; realignment of the jetty-pier with the construction of a keystone wall; repair of concrete surfaces showing signs of wear or deterioration; repair of delaminated reinforced concrete structures; protection of the pier head foundation.