Construction of the shore protection and shoreline walkway at Jardim Do Mar

Work owner
Secretaria Regional do Equipamento Social e Transportes - Governo Regional da Madeira
Location
Madeira
Year
2005

This work consisted of a sloped shore protection, with antifers, which runs from the north edge of the settlement to the existing boat ramp, over a distance of 750 m.
A promenade was built over the same distance ending with a car park near the boat ramp.