The purpose of these works was to create infrastructures that would provide better shelter for the boat ramp and allow the regional vessels to dock.
Following the construction of these works, the port was equipped with a concrete pier with a useable width of 8.2 m and 130 m long.
Extension of the Paul do Mar pier
Work owner
APRAM - Administração de Portos da Madeira
APRAM - Administração de Portos da Madeira
Year
2004
2004