{"id":4594,"date":"2020-07-23T16:04:15","date_gmt":"2020-07-23T16:04:15","guid":{"rendered":"https:\/\/afa.pt\/project\/projeto-ampliacao-aproveitamento-hidroeletrico-da-calheta-empreitada-concecao-construcao-da-central-hidroeletrica-da-calheta-iii-estacao-elevatoria-do-paul-e-conduta-forcada-elevatoria\/"},"modified":"2022-11-25T15:45:24","modified_gmt":"2022-11-25T15:45:24","slug":"projeto-ampliacao-aproveitamento-hidroeletrico-da-calheta-empreitada-concecao-construcao-da-central-hidroeletrica-da-calheta-iii-estacao-elevatoria-do-paul-e-conduta-forcada-elevatoria","status":"publish","type":"project","link":"https:\/\/afa.pt\/en\/project\/projeto-ampliacao-aproveitamento-hidroeletrico-da-calheta-empreitada-concecao-construcao-da-central-hidroeletrica-da-calheta-iii-estacao-elevatoria-do-paul-e-conduta-forcada-elevatoria\/","title":{"rendered":"Project to extend the hydroelectric development of Calheta. Contract for the design\/construction of the Calheta III hydroelectric plant, Paul pumping station and forced conduit\/pump"},"content":{"rendered":"<p>Works part of the project to extend the Hydroelectric Development of Calheta with four distinct design interventions: Calheta III Hydroelectric Plant with production capacity of 30 MW; Calheta Pumping Station; forced conduit\/pump from the Pico da Urze dam to the new Hydroelectric Plant, with a length of 3 km and 700 m level difference; Paul Pumping Station.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Works part of the project to extend the Hydroelectric Development of Calheta with four distinct design interventions: Calheta III Hydroelectric Plant with production capacity of 30 MW; Calheta Pumping Station; forced conduit\/pump from the Pico da Urze dam to the new Hydroelectric Plant, with a length of 3 km and 700 m level difference; Paul [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":4774,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[76],"project_tag":[68],"class_list":["post-4594","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-hydraulics-and-maritime","project_tag-madeira-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/afa.pt\/en\/wp-json\/wp\/v2\/project\/4594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/afa.pt\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/afa.pt\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/afa.pt\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/afa.pt\/en\/wp-json\/wp\/v2\/comments?post=4594"}],"version-history":[{"count":3,"href":"https:\/\/afa.pt\/en\/wp-json\/wp\/v2\/project\/4594\/revisions"}],"predecessor-version":[{"id":5402,"href":"https:\/\/afa.pt\/en\/wp-json\/wp\/v2\/project\/4594\/revisions\/5402"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/afa.pt\/en\/wp-json\/wp\/v2\/media\/4774"}],"wp:attachment":[{"href":"https:\/\/afa.pt\/en\/wp-json\/wp\/v2\/media?parent=4594"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/afa.pt\/en\/wp-json\/wp\/v2\/project_category?post=4594"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/afa.pt\/en\/wp-json\/wp\/v2\/project_tag?post=4594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}