This work, launched as a result of the storm of 20 February 2010, includes: realignment of the Santa Luzia and João Gomes streams, maritime works (extension of the mouths of the streams, the execution of a beach, a spur, a breakwater and a dock for maritime vessels), landscaping, road networks and engineering structures.