Containment and stabilisation of soil ravines over the deck of the airport runway and surrounding area. The works included the reprofiling of slopes, soil repositioning, rehabilitation and improvement of the drainage system surrounding the airport runway deck, with the construction of trenches, culverts, retaining enclosures and stilling basins in reinforced concrete.