Containment and stabilisation of the progression of soil ravines in the area surrounding the Aço neighbourhood. Works consisted of the construction of various channels all coinciding in a principal axis that flows into the river. The works included excavation and backfilling, softening of slopes, berm and slope crest trapezoid-shaped ditches, a soil-cement track area and finally all the slopes were covered with plant cover.