Construction of Câmara de Lobos – Ribeira Brava motorway – 2nd stretch – 1st and 2nd phases

Work owner
Secretaria Regional do Equipamento Social e Transportes - Governo Regional da Madeira
Location
Madeira
Type of work
Major Road Works
Year
2004

This section of works is 7100 m in length, with two carriageways at diferent elevations and with horizontal separation.
It includes 5 tunnels, the longest of which is Ribeira Brava with a length of 1800 m, 7 viaducts and three road interchanges.