Portfolio
Category

Variant of Madalena do Mar construction – phases 1 and 2

Construction and equipping of the Tômbwa pier bridge

Containment and stabilisation of the ravines on the Cuito Cuanavale airport runway

Reconstruction dnd regularization of Ribeira de São João – Urban segment (sectors 5 to 14)

Renovation and realignment of ribeira de Santa Luzia – urban section (km 0+386.38 to km 1+860.05)

Upkeep and maintenance of the Malange / Saurimo section

Construction of the fish auction and market, BaÃa Farta – Benguela

Renovation of the Moçâmedes railway station access road

Renovation of the highway – Chicolongilo / Bibala / Lugango bypass

Channelling and realignment of the Ribeira Brava stream, upstream from Meia Légua

Contract for the construction of the new Flamengos Church

Construction of new installations of the Gaspar Frutuoso Basic and Integrated School – Ribeira Grande
No results found.
